QUEST Which of the following is based on an individual identification with a more powerful person. 
A expert power 
B reward power 
C referent power 
D A and B. 
E A and C 
參考答案:C
QUEST Which of the following results are Win/Win conflict resolution? 
A compromising 
B forcing 
C problem solving 
D smoothly 
E withdraw 
參考答案:C
QUEST Which of the following organizations has the best technical project control? 
A matrix 
B functional 
C projectized 
D B and C 
E A and B 
參考答案:D
QUEST The functional organization is effective with a mature product or single product line. 
A TRUE 
B FALSE 
C參考答案:
D參考答案:
E參考答案:
參考答案:A

QUEST The strong matrix versus a weak matrix. 
A team members are more likely to be assigned to the project office in a strong matrix 
B strong matrix is more difficult to manage. 
C the balance of power has shifted away from the PM. 
D functional managers no longer has control over the technical processes. 
E All of the above. 
參考答案:A
相關(guān)試題:
2010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案七十四
試題推薦:
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
本站推薦
- 1高速公路項(xiàng)目部2010年度業(yè)務(wù)代表述職報(bào)告
 - 2廣西六欽高速某標(biāo)段2010年度施工進(jìn)度計(jì)劃
 - 3貴新高速公路粗苯泄漏的應(yīng)急監(jiān)測
 - 4交通部試驗(yàn)檢測師:交通安全設(shè)施測試題(2010年度)
 - 5交通部試驗(yàn)檢測工程師:橋涵工程試驗(yàn)檢測試題(2010年度)
 - 62010年公路工程試驗(yàn)檢測師考試復(fù)習(xí)資料
 - 7交通部試驗(yàn)檢測師:公路、材料測試題(2010年度)
 - 82010年一級(jí)建造師考試模擬題及復(fù)習(xí)大綱
 - 92010年全國一級(jí)建造師執(zhí)業(yè)資格考試模擬試題(含答案)
 